Finish your purchases before renovations begin
Quite often , bathroom renovations take longer because the delivery of tiles, plumbing fixtures or repair materials is delayed. Therefore, do not start renovating until you have all the necessary materials, sink, bathtub and tools in your home or garage. Take finishing materials, such as tiles, with a small margin. If workers split, cut incorrectly, or lay part of the tile in the wrong place, they will have to go to the store again. And the necessary collection and shade may run out, then you will have to waste time searching and ordering.
Conclude a detailed agreement
It is important to find a waterproofing services Melbourne team that has experience working under tight deadlines. Immediately discuss the scope of work and draw up a schedule. It should indicate the time frame for each stage of repair , the days and hours when workers come and leave. Don’t forget to include responsibility for missing deadlines. And study the reviews of previous customers to see if anyone has complained about poor-quality and delayed work.
Separately, we need to discuss the work algorithm. It is important that residents are not left without water and a toilet for more than a couple of days. The master must first replace the old plumbing, then the pipes and connect the new plumbing.
Start by removing the trim
Removing tile and old paint is a long and dusty process, but most of the trim can be removed without removing the toilet and bathtub from the bathroom. Even if they make it difficult to reach several pieces of tile, that’s okay. This can be done when you remove the old plumbing.
Remove old plumbing, change pipes and immediately install new ones
It is better to entrust this work to a master. Having experience in repairs, these tasks can be completed in one day. Prepare in advance to remove your old toilet and bathtub. The next day the technician will be able to connect the new plumbing. Thus, residents will be left without a toilet for one or two days.
Buy a dry toilet and other small household items
In those couple of days when there is no access to the bathroom, you need to take care of your own comfort. You can purchase a dry toilet in large repair stores. It has reservoirs for clean and used water, and special disintegrating liquids ensure cleanliness and no unpleasant odors. The more people in the house, the larger the volume of the water tank is needed. Optimally – from 20 liters.
For washing, it is worth purchasing bottled water and basins. Dry shampoo can also help. Don’t forget to buy rollers with sticky paper to clean your clothes – you’ll need them every time you leave the house.
Lay the tiles after installing the plumbing
Tiles can be laid both before and after installing plumbing fixtures. But speeding up the installation of plumbing and finishing work can be left for later. The craftsman will be able to cut tiles to fit the toilet foot, and the space under the closed bathtub does not necessarily need to be decorated with tiles.
Buy more protective film
She needs to close doorways, walls and floors in the hallway, and clear the hallway of furniture and mirrors. The film will also be needed in the common corridor on the way to the elevator. Lay it at least on the floor so you can quickly roll it up and not waste time cleaning. And the floors near the bathroom being renovated can be additionally lined with damp rags – dust settles well on them and does not scatter further around the apartment.
Do wet cleaning every day
After completing noisy and dusty work, you will have to carry out wet cleaning every time. This is important to ensure that apartment residents do not breathe fine construction dust. Cleaning also needs to be taken into account when scheduling workers. It is optimal if they complete the work an hour before children arrive from school and adults from work, so that whoever is supervising the repairs has time to clean up the mess.